X3 Sentinel·Step 06 · Command
Command View
Two numbers that matter, the signals behind them and what needs a leader today.
12 months to Oct 12, against the 12 before
Two Numbers, Side by Side
19 recordable cases × 200,000 ÷ 916,000 hours
2 more cases still waiting for a recordability decision
1 actual + 10 potential · 33% of 33 reported events
10 of 35 signals, most urgent first
Needs a Leader Today
- DeadlineActual SIFRegulation: 29 CFR 1904.39North Plant, Shipping Dock
A 24-hour OSHA report clock is running on a hospital admission
A forklift operator fell from the shipping dock edge at 01:40 and was admitted for surgery. The clock started when the EHS manager was told at 04:30.
- OverdueHigh potentialRiverside DC, Shipping Aisle
Interim fix at the shipping aisle crossing expired 4 days ago
People still cross a forklift lane behind a spotter and a painted line. The fixed barrier and gate are not in.
- Failed controlHigh potentialNorth Plant, Weld Cells
Gate interlock on Robot Weld Cell 1 was bypassed with a spare key, again
The same bypass was reported on Sep 24 (INC-2026-035) and the spare keys were collected. One was back in use this morning. The cell is locked out.
- Failed controlHigh potentialRiverside DC, Pick Mezzanine
Stop work at the pick mezzanine edge is in its ninth day
Bay 7 is barricaded. The rail replacement is due in 3 days and only site leadership can release the stop.
- OverdueHigh potentialNorth Plant, Press Line
Guard for the press brake back gauge is 11 days overdue
This is the fix from the Sep 17 fingertip fracture. The press is running without it.
- Failed controlHigh potentialRiverside DC, Yard
A live trailer was unloaded with no chocks at yard door 5
The restraint light was red and nobody stopped. The finding is one day old and has no fix date.
- Failed controlHigh potentialRiverside DC, Receiving Dock
Forklift 09 is on hold with a hydraulic leak
The tilt cylinder hose is wet along its length. The two night checks before it was found were ticked clean.
- OverdueHigh potentialNorth Plant, Press Line
Crane 01 hook latch has had a broken spring for 16 days
The crane lifts dies over the press line. A sling can slip off an open hook.
- Failed controlHigh potentialRiverside DC, Shipping Aisle
Vehicle and pedestrian control has been failing for 34 days
It is the same crossing as HZ-104. Two products are reporting one missing barrier.
- OverdueHigh potentialRiverside DC, High-Bay Racking
Damaged rack upright in aisle 12 is still loaded
The upright is creased and one anchor bolt is sheared. Unloading the bay is 2 days overdue.
X3 Sentinel reads these signals. It does not change the records behind them: each link opens the screen of the product that owns the record.